They are estimating that the marinas will need to dredge sediment every 6 years and the Port every 12. That is a pretty big cost to push off of this project.

Capitol lake was designed to be a sediment trap but the State has refused to do periodic dredging as was intended.

That is why the lake is now shallow and choked with weeds

From: DES hears Port’s concerns over shared dredging costs of Deschutes Estuary project 