They are estimating that the marinas will need to dredge sediment every 6 years and the Port every 12. That is a pretty big cost to push off of this project.
Capitol lake was designed to be a sediment trap but the State has refused to do periodic dredging as was intended.
That is why the lake is now shallow and choked with weeds
Please explain the inappropriate content below.